Hopefully (fingers crossed) our septic will be repaired today. I was overly optimistic yesterday with my expectation that we were done. Apparently yesterday the electrician's repairs were completed. They also pumped the septic in preparation for the pump installation. Unfortunately, they failed to verify that they had the necessary pump in stock. It turns out that they do not, so project completion was bumped to this afternoon.
Because they already pumped the septic, we are under a strict 'no water waste' restriction. I filled our sinks up with boxes and put signs on each toilet to warn against flushing. Hopefully we will be able to resume water use this afternoon. Our bathrooms are becoming odoriferous and the dishes are piling up on my countertops. At this point in the move, living in this house has become unpleasant.
While Scott is dealing with the septic issues and repairmen, I will be picking up Robby from school. It is hard to believe that we are already at Thanksgiving break! I'm so excited to have him home for an entire week. The timing is perfect because I plan on using the time to prioritize and complete packing this house.
No comments:
Post a Comment